A major shortage of non-road diesel led to ExxonMobil’s fast timeline for expanding their Baton Rouge refinery’s NRD unit, and an additional challenge appeared when the wrong wear pads were specified (FRP, but not APP), putting further pressure on the project’s timeline. APP provided over 5,000 wear pads in a three-week time frame, meeting the project’s schedule and eventually contributing to hundreds of thousands of dollars saved in installation costs.
APP ProTek Wear Pads delivered
timeline for delivery
saved on installation costs
CLIENT | ExxonMobil |
INDUSTRY | Petrochemical |
PRODUCT | APP ProTek Wear Pads and ProTek Pipe Shoes |
A boom in NRD demand led to an extremely fast timeline for ExxonMobil’s NRD unit expansion. And where there’s speed, there’s a need for planning and careful execution. ExxonMobil tapped APP for the project after a miscommunication with a contractor landed them with FRP wear pads — not the APP product they had originally specified. In order to meet the growing NRD demand, ExxonMobil reached out to APP to get the right products in place — fast.
APP delivered 5,000+ ProTek Wear Pads in the space of three weeks, helping ExxonMobil meet their strict project timeline. APP also assisted in the removal of the incorrect (and incorrectly installed) wear pads, 500 of which had already been installed. In addition, APP: