Delivery timing for appropriate pipe shoes was a significant issue for the Gulf Pascagoula LNG project. APP was chosen to deliver CryoTek Pipe Shoes to meet the project’s needs — they knew that delivery and installation timelines would be crucial. By choosing a pipe support that features a streamlined installation process, Gulf LNG saved over $1M, shortened their installation timeline by six months and became the first LNG project in the United States to use cold composite pipe shoes.
months in construction time saved
LNG project in the U.S. to use cold composite pipe shoes
saved in pipe shoe installation costs
CLIENT | Gulf LNG |
INDUSTRY | Cold/Cryogenic Process |
PRODUCT | CryoTek Pipe Shoe |
The client was aware of APP’s CryoTek pipe shoes’ successful usage in ethylene production facilities, and saw an opportunity to apply them as an LNG pipeline solution. After extensive testing of the CryoTek Pipe Shoe, the client decided to go forward with APP — and APP delivered, meeting their deadline. Had metallic pipe shoes been sourced instead, the shipping costs alone would have added up to a significant amount. Add to that the cost of installation requiring heavy-lift equipment, and the project budget could have been seriously impacted.
2,000 APP pipe supports for pipes sized 4" – 36", including the CryoTek Pipe Shoe, helped our clients meet their time and budget goals. This lightweight pipe shoe was developed for use in cryogenic conditions, and features a streamlined installation process. In addition, it: